Operators prefer plug-and-perf, utilizing plugs when it comes to multistage hydraulic fracturing. It opened the door for effective hydraulic fracturing and is dependable and adaptable.
The majority of new well completions in North America today are plug-and-perf completions using plugs, which have long been preferred by unconventional operators. Traditional plug-and-perf completions allow for flexible stage placement and stage treatment up to the range of wireline and coiled tubing (CT).
Interested?
If you are interested in this item and have some questions, feel free send an inquiry.
Click Here